{"article":{"id":18828438733083,"url":"https://fieldwirelabs.zendesk.com/api/v2/help_center/en-us/articles/18828438733083.json","html_url":"https://help.fieldwire.com/hc/en-us/articles/18828438733083-Introduction-to-Change-Orders-in-Fieldwire","author_id":412807087952,"comments_disabled":true,"draft":false,"promoted":false,"position":0,"vote_sum":3,"vote_count":3,"upvote_count":3,"downvote_count":0,"section_id":18830038304283,"created_at":"2023-09-15T23:35:55Z","updated_at":"2026-11-14T22:21:41Z","name":"Introduction to Change Orders in Fieldwire","title":"Introduction to Change Orders in Fieldwire","source_locale":"en-us","locale":"en-us","outdated":false,"outdated_locales":[],"edited_at":"2026-05-07T13:22:31Z","user_segment_id":null,"permission_group_id":524726,"content_tag_ids":[],"label_names":["void","změnové listy","ungültig","approval","rejection","presets","request_cost","voreinstellungen","überprüfung","genehmigung","ablehnung","überarbeitung","kosten_anfordern","änderungsauftrag","rejet","richiedi_costi","approvazione","pre-impostare","solicitar_el_coste","wijzingsopdracht","afwijzing","demande_de_variation","préréglages","demander_le_coût","validation","variante_in_corso_d'opera","rifiuto","orden_de_cambio","preajustes","aprobación","rechazo","kosten_aanvragen","goedkeuring","äta","flöringställningar","godkännande","begära_en_kostnad","avslag","Órdenes de cambio","ÄTA","Lisätyöt","wijzigingsopdracht","ekstra_arbejde","zmiana_zamówienia","demande_de_travaux_modificatifs","Änderungsauftrag","změnový_list","Ellenőrző_lista","Orden_de_cambio","video_change-orders-fieldwire"],"body":"<h2 id=\"h_01HADK727QV1TZS573N1BH8MGB\">Overview</h2><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18829190901019\" alt=\"Change_orders___Fieldwire_2.png\"></p><p>On every construction project there are changes that impact the original scope, cost, and schedule. To capture those changes, contractors utilize Change Orders that describes what has changed and the associated cost/schedule impact of that change. There can be anywhere from dozens to thousands of Change Orders on a project, and it is vital to the contractor’s financial health and reporting to ensure they are managing them correctly. </p><p>The Change Orders is within Fieldwire's suite of Project Management tools, and it integrates with other Fieldwire features, allowing you to have a single source of truth for agreed scope changes, faster data gather from relevant parties/stakeholders, faster approval process, etc.</p><p>In order to acquire this feature on your account, you can <a href=\"https://www.fieldwire.com/demo/pm/\" target=\"_blank\" rel=\"noopener noreferrer\">schedule a demo with our sales team</a> or you can purchase it with <a href=\"https://www.fieldwire.com/pricing\" target=\"_blank\" rel=\"noopener noreferrer\">Business Plus</a>. If you are already on Business Plus, Change Orders will be automatically added to your Account.</p><p><strong>Note:</strong> Change Orders are only available on the web version of Fieldwire at this time.</p><p> </p><h2 id=\"h_01HADKN6Q0REB6PPSVD5MWDXTP\">Table of Contents</h2><ul>\n<li data-list-item-id=\"eeb68b3869eddc9fe29547a2d53e23def\">\n<a href=\"#h_01FK101BG1Z4WR3HHAPKPES26P\">How to Enable PM on a Project</a><ul>\n<li data-list-item-id=\"e6e473cb5b73c1064e0ec7f35dc58e6a9\"><a href=\"#h_01H83K46R2S9Q7TMPPGCGC2NMV\">Change Order Permissions Table</a></li>\n<li data-list-item-id=\"eae3772a80375791d15bf809712a813f5\"><a href=\"#h_01G7TGKKET85WFAGBS8EV2HX20\">Project Management Onboarding</a></li>\n<li data-list-item-id=\"eb77f588404181fdee0d02cb04216b835\"><a href=\"#h_01H83K2YG3NYDJG39SE19AWRN6\">How to set a Lead Company</a></li>\n</ul>\n</li>\n<li data-list-item-id=\"e4b9264d8558ed843b6166875b4ddb8c0\">\n<a href=\"#rfi%20workflow\">The Change Order Workflow</a><ul>\n<li data-list-item-id=\"ee65bb4a34369b7302f39a8a2bac2ce1c\"><a href=\"#h_01K45C5J3VJA5WZSS0QHS1R8KC\">Activity Feed</a></li>\n<li data-list-item-id=\"e55b84729ce78cdccd26ab8dafc44b19b\"><a href=\"#h_01G918NS723HQWKWY3QGQ1ET0A\">Watchers</a></li>\n</ul>\n</li>\n<li data-list-item-id=\"e442bb7f99f54646387f7cdde77a44c28\">\n<a href=\"#h_01G7D9Y4JZYVFSQNCGJ4D60NS1\">The Change Orders Tab</a><ul>\n<li data-list-item-id=\"e6d4a2f6db8501d9605dc24f35b76dd43\"><a href=\"#h_01JWSD88YW8RC15G02EDRRWY01\">Filter Change Orders</a></li>\n<li data-list-item-id=\"e4b6df355e32658077ffaf107332e4a10\"><a href=\"#h_01HRCZ4NBGGD0Z4BY0EGCW45PF\">Change Order Presets</a></li>\n</ul>\n</li>\n<li data-list-item-id=\"e5c84c27c7cbcfe0052daf859d958515b\">\n<a href=\"#h_01HAE41MZ0Q8402STFNTA59TCH\">Create a Change Order</a><ul><li data-list-item-id=\"efeb20b97893659a93de6abe60d9dd811\"><a href=\"#h_01JYM7S3YY9DFP1QKX3Q8M5DQ1\">Linking to a Change Order</a></li></ul>\n</li>\n<li data-list-item-id=\"ea6b230bda2416e284f57f39d2f6c2519\"><a href=\"#h_01HADRP6QMG64VJBT6Q04TN9WX\">Request Cost</a></li>\n<li data-list-item-id=\"e0d05e2efa4d5530a58b5575e64eecdd7\"><a href=\"#h_01HADS5Z0HHYJP3VKPVDZM4HY1\">Submit for Approval</a></li>\n<li data-list-item-id=\"ed16a49b6d340520618dec4f2e75544e6\"><a href=\"#h_01HADSR2451M6RZEYPTSSKG100\">Send Rejection</a></li>\n<li data-list-item-id=\"effe82b05fd9bb8e56cb2c6cf9ca9c832\"><a href=\"#h_01HADT18N4SJ228BETQ80RVBWS\">Create Revision</a></li>\n<li data-list-item-id=\"ef899828ee5380044c7e1771b076a69cf\"><a href=\"#h_01HAE307E8362N6Y32KDTMS3N7\">Send Approval</a></li>\n<li data-list-item-id=\"e963be9178406e58afcef81854c50d422\"><a href=\"#h_01JPN2ZCHM168V854G287A7EFN\">Void</a></li>\n</ul><p> </p><h2 id=\"h_01FK101BG1Z4WR3HHAPKPES26P\">How to Enable PM on a Project</h2><p class=\"wysiwyg-text-align-left\">For information on companies and how to enable PM on a project, please see this article:<a href=\"https://help.fieldwire.com/hc/en-us/articles/9736608004763\" target=\"_blank\" rel=\"noopener noreferrer\"> How to Enable PM and Manage Companies on a Project</a>.</p><p class=\"wysiwyg-text-align-left\"> </p><h3 class=\"wysiwyg-text-align-left\" id=\"h_01H83K46R2S9Q7TMPPGCGC2NMV\">Change Order Permissions Table</h3><figure class=\"wysiwyg-table\" style=\"width: 750px;\"><table style=\"margin-left: 0px; margin-right: auto;\">\n<thead><tr>\n<th>Action</th>\n<th>Manager</th>\n<th>Contributor</th>\n</tr></thead>\n<tbody>\n<tr>\n<td>Create new Change Order</td>\n<td>✔</td>\n<td>x</td>\n</tr>\n<tr>\n<td>Edit Draft Change Order content</td>\n<td>✔</td>\n<td>✔</td>\n</tr>\n<tr>\n<td>Edit Draft Change Order details</td>\n<td>✔</td>\n<td>✔</td>\n</tr>\n<tr>\n<td>Reassign in my company</td>\n<td>✔</td>\n<td>x</td>\n</tr>\n<tr>\n<td>Delete Draft Change Order</td>\n<td>✔</td>\n<td>x</td>\n</tr>\n<tr>\n<td>Request Change Order</td>\n<td>✔</td>\n<td>x</td>\n</tr>\n<tr>\n<td>Submit Change Order for approval</td>\n<td>✔</td>\n<td>x</td>\n</tr>\n<tr>\n<td>Edit response</td>\n<td>✔</td>\n<td>✔</td>\n</tr>\n<tr>\n<td>Submit response</td>\n<td>✔</td>\n<td>x</td>\n</tr>\n<tr>\n<td>Use presets</td>\n<td>✔</td>\n<td>✔</td>\n</tr>\n<tr>\n<td>Set up presets*</td>\n<td>✔</td>\n<td>x</td>\n</tr>\n</tbody>\n</table></figure><p> </p><p><strong>Key items to note:</strong></p><ul>\n<li data-list-item-id=\"ee148df9a4543031e1fb7963305dd8e32\">All permissions assume the user is in the same company as the current assignee unless noted.</li>\n<li data-list-item-id=\"e6a9b51027c1d88f3f9a278e7d9a46053\">When a Lead company is set on the project, users in the non-Lead company cannot <strong>Respond on behalf</strong>, even if they are the ones to submit the Change Order to the Lead company user</li>\n<li data-list-item-id=\"e83ec686b373b792c35585977f149f618\">Reassigning change orders:<ul>\n<li data-list-item-id=\"ecb7f6d26846366675b5f69b83e466faa\">When a Lead Company is set, only Managers in the Lead Company can reassign</li>\n<li data-list-item-id=\"e9786e4ffad545a055dffbe12de67df03\">When a Lead Company is <strong>not</strong> set, Managers in both the creator and assignee companies can reassign</li>\n<li data-list-item-id=\"e16caf02a606680c41f3569fc8fcf0023\">In the <strong>Pending approval</strong> status, a Change Order can be reassigned to project users or email addresses <strong>in any company</strong>\n</li>\n<li data-list-item-id=\"e07cab3c854a087563393259ae6a55a70\">In <strong>Requested</strong> or <strong>Pending revision</strong>, a Change Order can be reassigned to project users or email address <strong>in the same company</strong>\n</li>\n<li data-list-item-id=\"edbb61345acd1ada4f2eb55bbbbc7f11f\">If the Change Order is transitioned from Pending approval to Rejected, then:<ul>\n<li data-list-item-id=\"eb3ed867bf7ae60a17d9c31ad838e59c9\">Draft&gt;&gt;Pending approval&gt;&gt;Rejected: the Change Order is assigned back to user who submitted it for approval</li>\n<li data-list-item-id=\"e308722621f69baae0f66534610cd22c0\">Draft&gt;&gt;Requested&gt;&gt;Pending approval&gt;&gt;Rejected: the change Order is assigned back to the user who it was requested from</li>\n</ul>\n</li>\n</ul>\n</li>\n</ul><p class=\"wysiwyg-text-align-left\"> </p><h3 id=\"h_01G7TGKKET85WFAGBS8EV2HX20\">Project Management Onboarding</h3><p><span style=\"font-weight: 400;\">If you are accessing the Change Orders (or any Project Management) tab for the first time, you will see a pop-up to help get you started with Project Management in Fieldwire and setting up your “Company” on the project. </span></p><ol>\n<li data-list-item-id=\"eebee30d284e91b72e9bdc6dcf47b3da0\"><span style=\"font-weight: 400;\">Add your company name </span></li>\n<li data-list-item-id=\"ef74c3bdab62d0be38c13d32cea2b47ca\">\n<span style=\"font-weight: 400;\">Click the <strong>Next</strong> button. </span><ul><li data-list-item-id=\"e10a4598b093991c2cca89a0f52d96d56\">\n<span style=\"font-weight: 400;\">This will be the same company name for all PM modules on the project. However, it is not automatically filled by the “Company” information you put into your profile settings. (For more information about profile settings, check out this article: </span><a href=\"https://help.fieldwire.com/hc/en-us/articles/202635214\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"font-weight: 400;\">Q&amp;A: How do I update my email address and other profile information?</span></a><span style=\"font-weight: 400;\">)</span>\n</li></ul>\n</li>\n</ol><p><img src=\"https://help.fieldwire.com/hc/article_attachments/23883280853009\" alt=\"Screenshot 2024-04-03 at 9.37.49 AM.png\"></p><p> </p><p class=\"wysiwyg-indent1\">3. Enter your company code, which will help you and your team stay organized throughout the project.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/23883280853009\" alt=\"Screenshot 2024-04-03 at 9.37.49 AM.png\"></p><p> </p><p>And, that’s it! In the example shown in these screenshots, we used the company name, ABC, as well as the company code, ABC.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/23883298781969\" alt=\"Screenshot 2024-04-03 at 9.38.15 AM.png\"></p><p class=\"wysiwyg-text-align-left\"> </p><h3 class=\"wysiwyg-text-align-left\" id=\"h_01H83K2YG3NYDJG39SE19AWRN6\">How to set a Lead Company</h3><p>To make sure that all RFIs, Submittals, and Change Orders go through your \"company\" in Fieldwire, you can now set a Lead Company. To get started, </p><ol>\n<li data-list-item-id=\"ea145f50849fd613e56a3b7515cafb585\">Go to the <strong>project People tab</strong>\n</li>\n<li data-list-item-id=\"eaad61a8d20c801fe01d31e0a3f6e77c2\">Click on <strong>Set lead company</strong> for the company that you want to be considered the \"lead\".</li>\n</ol><p><img src=\"https://help.fieldwire.com/hc/article_attachments/23883280871953\" alt=\"Screenshot_2024-04-03_at_9_29_23 AM.png\"></p><p> </p><p>After clicking on \"Set lead company\", you'll get a pop-up that indicates what the users in the Lead company can do vs users in the \"Other companies\" that were not designated to be the lead. <strong>For example, users in the Lead company can send change orders to or request change orders from any company, whereas users in the \"Other companies\" can only send change orders to the lead company.</strong></p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/38696612728209\" width=\"2940\" height=\"1468\"></figure><p> </p><p>Once you've decided that you do want to set a lead company, you'll need to click on the blue \"Set lead company\" button. After you click the blue button, you'll see the lead company indicated with a crown icon and \"Lead company\" next to it.</p><p><img style=\"height: auto;\" src=\"https://help.fieldwire.com/hc/article_attachments/18828732045723\" alt=\"People___Fieldwire.png\"></p><p> </p><p>If you mistakenly choose the incorrect lead company, any Admin on the project can change it by doing the following:</p><ol>\n<li data-list-item-id=\"efe732c651e2209281db61a712aa83c98\">Click the three dots (⋮) next to the invite user(s) icon</li>\n<li data-list-item-id=\"e70f58238448e601cecf881d1eb703f18\">Select <strong>Remove lead company</strong>\n</li>\n</ol><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1472;\" src=\"https://help.fieldwire.com/hc/article_attachments/44640230718097\" width=\"2940\" height=\"1472\"></figure><p> </p><h2 id=\"rfi workflow\"><span style=\"font-weight: 400;\">The Change Order Workflow</span></h2><p><span style=\"font-weight: 400;\">A Change Order can adopt different ‘statuses’, depending on the stage the Change Order is in. Since all Change Orders follow the same flow for progression, review the table below for an explanation of the different statuses a Change Order will adopt:  </span></p><figure class=\"wysiwyg-table wysiwyg-table-align-left\" style=\"height: 796px; width: 676px;\"><table><tbody>\n<tr style=\"height: 44px;\">\n<td style=\"height: 44px; width: 118.836px;\"><strong>Change Order Status</strong></td>\n<td style=\"height: 44px; width: 534.164px;\"><strong>Definition</strong></td>\n</tr>\n<tr style=\"height: 229px;\">\n<td style=\"height: 229px; width: 118.836px;\"><span style=\"font-weight: 400;\">Draft </span></td>\n<td style=\"height: 229px; width: 534.164px;\">\n<p><span style=\"font-weight: 400;\">A Change Order is in the ‘Draft’ status when it is first created. To create a Draft Change Order, you must have the Manager permission within PM access.</span></p>\n<p><br> </p>\n<p><span style=\"font-weight: 400;\">While the Change Order is in the ‘Draft’ status, you can add details and cost information. When the change order is ready, it can either be submitted for approval or requested.</span></p>\n<p><span style=\"font-weight: 400;\"><strong>Note:</strong> While the 'Draft' status is where you initially add details and cost information, these details can be updated in any status by Managers in the Change Orders creator's or assignee’s company.</span></p>\n</td>\n</tr>\n<tr>\n<td style=\"width: 118.836px;\"><span style=\"font-weight: 400;\">Requested</span></td>\n<td style=\"width: 534.164px;\"><span style=\"font-weight: 400;\">If requested (the status transitions from Draft to Requested), the new assignee can then add cost information to the change order and submit it back to the user who requested it from them, transitioning the status from Requested to Pending approval.</span></td>\n</tr>\n<tr style=\"height: 125px;\">\n<td style=\"height: 125px; width: 118.836px;\"><span style=\"font-weight: 400;\">Pending Approval</span></td>\n<td style=\"height: 125px; width: 534.164px;\">In the Pending approval status, the new assignee can either approve or reject the change order, sending it back to the user that submitted it to them. This will transition the status to either Approved or Rejected respectively.</td>\n</tr>\n<tr style=\"height: 44px;\">\n<td style=\"height: 44px; width: 118.836px;\"><span style=\"font-weight: 400;\">Rejected </span></td>\n<td style=\"height: 44px; width: 534.164px;\"><span style=\"font-weight: 400;\">If Rejected, the user who submitted it for approval is the new assignee and they have the option to create a revision of the change order if they want to modify the cost details and resubmit.</span></td>\n</tr>\n<tr>\n<td style=\"width: 118.836px;\"><span style=\"font-weight: 400;\">Pending Revision</span></td>\n<td style=\"width: 534.164px;\">\n<p><span style=\"font-weight: 400;\">Once a revision is created, the status transitions from Rejected to Pending revision.</span></p>\n<p><span style=\"font-weight: 400;\">If a revision is created, the user has the option to copy over the last version’s cost information and backup documents, so they can build off of the previous revision or start from scratch.</span></p>\n<p><span style=\"font-weight: 400;\">Once the change order is ready to resubmit, Managers can submit for approval again transitioning it from Pending revision to Pending approval. The Pending approval workflow recommences with the new revision.</span></p>\n</td>\n</tr>\n<tr style=\"height: 125px;\">\n<td style=\"height: 125px; width: 118.836px;\"><span style=\"font-weight: 400;\">Approved</span></td>\n<td style=\"height: 125px; width: 534.164px;\">If Approved, there is no further action to be taken on the change order.</td>\n</tr>\n<tr>\n<td style=\"width: 118.836px;\">Void/Unvoid</td>\n<td style=\"width: 534.164px;\">If a change order is made 'void', then it is no longer valid. However, it can be 'unvoided' if something needs to be updated or if it was voided by mistake.</td>\n</tr>\n</tbody></table></figure><p> </p><h3 id=\"h_01K45C5J3VJA5WZSS0QHS1R8KC\">Activity Feed</h3><p>Throughout the Change Order process, all users will be able to keep track of the status of the Change Order, when information was requested/submitted as well as who requested/submitted that information.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/38654566220049\" width=\"2940\" height=\"1468\"></figure><p> </p><p>If you assign the Change Order to a non-user (i.e. an email address), this will log the response that the Assignee provides via email in the activity feed of the Change Order in Fieldwire. If you are the creator of the Change Order or a Manager in the company of the creator, then when looking at the response in the activity feed, you will be able to click on <strong>Add to change order</strong> to confirm that as the update to the Change Order. After clicking on <strong>Add to change order</strong>, the information will be added to the Notes section, and you will be able to proceed with the Change Order.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/38654522380177\" width=\"2940\" height=\"1468\"></figure><p> </p><h3 id=\"h_01G918NS723HQWKWY3QGQ1ET0A\">Watchers</h3><p>Within the “Watchers” tab you’ll be able to add and remove “Watchers” at each step of the workflow. In order to do so, you’ll need to click on “+ Add watcher” and click on the name of the person/persons that you'd like to add. You can also remove that Watcher by clicking the “x” that appears by hovering over their name.</p><p><strong>Note:</strong> Watchers from the Creator's company as well as the current Assignee cannot be removed as Watchers.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18833445949723\" alt=\"Change_orders___Fieldwire_2.png\"></p><p> </p><p>If that user is not currently on that project, you have the ability to invite them. However, please note that if the new user you are inviting is not on your Account, <strong>you will be charged an additional fee</strong> if you do not have the available license(s) to cover that user. </p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18833458945307\" alt=\"Change_orders___Fieldwire_2.png\"></p><p> </p><p>In addition to adding Watchers in the 'Details' section, you’ll also be able to add/remove Watchers within most Change Order status pop-up boxes.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18833458951707\" alt=\"Change_orders___Fieldwire_2_1.png\"></p><p> </p><h2 id=\"h_01G7D9Y4JZYVFSQNCGJ4D60NS1\" dir=\"auto\">The Change Orders Tab</h2><p><span style=\"font-weight: 400;\">Any individual associated with a Company, as either a Manager or Contributor, can access the ‘Change Orders’ tab - here, they are able to access each change in the project, independent of the ‘Status’.</span></p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/23177096856849\" alt=\"Screenshot_2024-03-07_at_10_18_20 AM.png\"><br><br>The headers in this tab provide a high-level overview on the #, Name, Status, Due Date, Total cost, and Assignee of the Change Orders across the project. More specifically, these headers are defined below: </p><ul dir=\"auto\">\n<li data-list-item-id=\"eb057c09dbf2233efe81b709bc6be83bd\">\n<strong>#: </strong>The 'Company Code' is assigned by the company the change order is being requested from and added when the change order moves from Draft to the Requested or Pending approval statuses.</li>\n<li data-list-item-id=\"ed97613f2fc55af73b960ffec539614cf\">\n<strong>Name:</strong> The title of the change order, added when the change order is created.</li>\n<li data-list-item-id=\"ece22a25b29b47562435742009f1e82ec\">\n<strong>Status:</strong> The current state of the change order, which dictates what actions are available to the users - can be ‘Draft’, ‘Requested’, ‘Pending review’, ‘Pending approval’, ‘Pending close’, ‘Closed’, and ‘Void’.</li>\n<li data-list-item-id=\"eca4c1ff713146d1646898b44cbe7af57\">\n<strong>Due date:</strong>  Added by the user requesting the change order. It reflects the date the submitter should send the change order to the user requesting it.</li>\n<li data-list-item-id=\"e434a11edeafcf5750e3f106c58940168\">\n<strong>Total Cost:</strong> The total cost captured in the change order.</li>\n<li data-list-item-id=\"ecae2264c02619fa6053fe8ed33b1ad76\">\n<strong>Assignee:</strong> The current owner of the Change Order's next actions.</li>\n</ul><p>In addition, you'll notice the various statuses up at the top where you'll be able to easily see how many change orders are on the project in each status as well as keep track of the dollar amount that's been approved.</p><p> </p><h3 id=\"h_01JWSD88YW8RC15G02EDRRWY01\">Filter Change Orders</h3><ol>\n<li data-list-item-id=\"e9dd0583147ff917d387210d9f9cad321\">Go to the <strong>Change Orders</strong> module</li>\n<li data-list-item-id=\"eb97764aa35ea89fcd7207eac369f2a5c\">Select the <strong>Filters </strong>button</li>\n</ol><p>You can filter your change orders by:</p><ul>\n<li data-list-item-id=\"e06ace8f34d53738a673cc9ed2edff5b2\">\n<strong>Watching</strong>: Shows change orders that the logged-in user is watching</li>\n<li data-list-item-id=\"e79e4e8880c5fc39e20f748297eda60fe\">\n<strong>Status</strong>: The phase that the change order is currently in: Draft, Requested, Pending revision, Pending approval, Approved, Rejected, and/or Void</li>\n<li data-list-item-id=\"e0cdb0f94c755f9c43b8ec836cf34a0b7\">\n<strong>Company</strong>: The companies that have been created within the project</li>\n<li data-list-item-id=\"e67d5807a7bb02997e2436e6744c538e9\">\n<strong>Assignee</strong>: The individual assigned to the change order at that given time</li>\n<li data-list-item-id=\"eb658cab0014f0cc54f44a02cf9ce1892\">\n<strong>Reason</strong>: The reason for the change order: Design change, Owner change, Unforeseen condition, Drawing error, Trade damage, Weather impact, Material delay, Trade constraint, and/or Other</li>\n<li data-list-item-id=\"e25c79e7a9ee5f0f718a46b487126e6fa\">\n<strong>Schedule impact</strong>: Is there an impact to the schedule based on the contents of the change order: Yes, No, Maybe</li>\n<li data-list-item-id=\"e22a451baca90eb56eecf3d2456f891d1\">\n<strong>Last update</strong>: The last time the change order has been modified</li>\n</ul><p><img src=\"https://help.fieldwire.com/hc/article_attachments/35840491071889\" alt=\"2025-06-02_18-50-31 (1).gif\"></p><p> </p><p>If you are filtering by a <strong>Company</strong>, you are able to view a summary of the original contract value, approved changes, and the current contract total, which this offers immediate insight into how change orders shape the project’s financial scope. </p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/35840475629585\" alt=\"2025-06-02_19-08-32 (1).gif\"></p><p> </p><h3 id=\"h_01HRCZ4NBGGD0Z4BY0EGCW45PF\">Change Order Presets</h3><p>To help accelerate the change order creation process, you can establish preset costs that are often reused when creating a change order. </p><p>These preset costs can be set for <strong>Materials</strong>, <strong>Labor</strong>, <strong>Equipment</strong>, <strong>Subcontractor</strong>, <strong>Other</strong>, and <strong>Cost markups</strong>. These match the 6 sections that you can fill out during the change order creation process. All Admin users on the project can set and edit the presets.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/33887798135825\" alt=\"2025-03-28_13-33-19 (1).gif\"></p><p> </p><p><strong>To start creating presets:</strong></p><ol>\n<li data-list-item-id=\"eeadf99538043148c985c708dd1b32731\">Click on the <strong>Manage cost presets</strong> button in the upper right-hand corner<ul><li data-list-item-id=\"eee15b1fb7bd77fefd24434b791ab1fb4\">This will bring up a new pop-up where you'll be able to create new presets for the 6 different sections mentioned above</li></ul>\n</li>\n<li data-list-item-id=\"e52b9e6e3d021fc0dd771924aa4fe709b\">Click on the relevant section name</li>\n<li data-list-item-id=\"efb2bcc25f4873e1fbfe4f46a2ea17a09\">Click <strong>Add [section] preset</strong>\n</li>\n<li data-list-item-id=\"e40ed6ebe5a5029105a5976deae7ac221\">Enter the relevant information for:<ul>\n<li data-list-item-id=\"e3bbac05de3a3c00a42494c2b37903278\">\n<strong>Name</strong>, <strong>Unit type</strong>, and <strong>Unit cost [currency]</strong>.<ul>\n<li data-list-item-id=\"e07a624887a17fa0dd2104c2bab890ecd\">The only required field to create a preset is <strong>Name</strong>\n</li>\n<li data-list-item-id=\"eb98445b9956ea232eb1c3e481c70ad1b\">The <strong>Unit type</strong> field is a dropdown where you'll see the same types that are listed when filling out the change order, itself. This field captures what you need with units such as Linear meters, Gallons, and Liters to name a few.</li>\n<li data-list-item-id=\"ede5e016536312a959d10d65f865c47ed\">The currency shown in the <strong>Unit cost</strong> field changes depending on which currency you have selected in the Project Settings.</li>\n</ul>\n</li>\n<li data-list-item-id=\"ec593ee01599d4b0843c7389db303db5a\">The fields for Cost markups are different. Check out the next paragraph to see how to fill out those presets.</li>\n</ul>\n</li>\n<li data-list-item-id=\"ec04a016ac89ba33f2ffc92401e33070a\">Click the checkmark if you wish to save your cost presets for a particular section</li>\n</ol><p> </p><p>For <strong>Cost markup</strong> presets, you'll notice different options:</p><ul>\n<li class=\"wysiwyg-list-bold\" data-list-item-id=\"ef76b8fdaa1011cb805df7f81e5155a45\"><strong>Name</strong></li>\n<li class=\"wysiwyg-list-bold\" data-list-item-id=\"e565fa2b4be16d6dab00c171fc88344b0\">\n<strong>Applied section</strong><ul><li data-list-item-id=\"e66224a6c6492abe13ae8b915c59c96e3\">This option refers to the other 5 sections of the change order as well as options for Subtotal and Subtotal + Markups.</li></ul>\n</li>\n<li class=\"wysiwyg-list-bold\" data-list-item-id=\"e74dae4beecc8dc149bee928a8a551449\"><strong>Percentage (%)</strong></li>\n<li class=\"wysiwyg-list-bold\" data-list-item-id=\"e747862b98e72ae2b6af0feccbc6f904a\">\n<strong>Apply by default</strong><ul>\n<li data-list-item-id=\"e7e301417652e5a9a9d446176de28f14b\">Toggling it on means that particular line of cost markup will be automatically added to all of the change orders upon creation.</li>\n<li data-list-item-id=\"ea548a7d08e066865ddb2f053f6110e06\">Toggling it off means that it will not be added by default, but you can easily add it to your change order under the cost markup section on the change order, itself</li>\n</ul>\n</li>\n</ul><p><strong>Note:</strong> <strong>Once a</strong> <strong>preset is deleted, it cannot be recovered.</strong></p><p><strong>Note:</strong> As is mentioned on the pop-up, Presets will be visible to all project users when creating change orders.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/23265772516497\" alt=\"Screenshot 2024-03-11 at 6.12.44 PM.png\"></p><p> </p><p>To accelerate the change order creation process even more, <strong>you can import presets</strong>. </p><p>To <strong>import presets</strong>, do the following:</p><ol>\n<li data-list-item-id=\"efbb004f3756ededf012f6c2b88c0c727\">Click on the <strong>Manage cost presets</strong> button in the upper right-hand corner</li>\n<li data-list-item-id=\"e307c2257e0589fe34bf6f125810487dd\">Click <strong>Import presets</strong>\n</li>\n<li data-list-item-id=\"eb03eafe8a5c5f2b5c9e6ce5a3ae856c1\">Download the template that's provided</li>\n<li data-list-item-id=\"e54cc04d5fa4832674da80d6b9b077fec\">Fill out the relevant information on each of the tabs on the spreadsheet<ul>\n<li data-list-item-id=\"e0599f396ea40b1b614f67f6fcc26d4c8\">This includes the presets that you want to import for Materials, Labor, Equipment, Subcontractor, Other, and Cost Markups</li>\n<li data-list-item-id=\"e22609336e40eb7dfcc31a7752e844f0f\">The entries on the spreadsheet match the fields that you would fill out as if you were completing the presets within Fieldwire</li>\n</ul>\n</li>\n<li data-list-item-id=\"e4786e1f6b7e04af62c5dfc03085a5ef0\">Save the updates you made to the spreadsheet</li>\n</ol><p><img src=\"https://help.fieldwire.com/hc/article_attachments/34605778700817\" alt=\"2025-04-22_16-15-13 (1).gif\"></p><p> </p><p>Once you have entered your cost preset information on the spreadsheet, do the following:</p><ol>\n<li data-list-item-id=\"ef980024e7ee27aaf9b3efc9af64e9223\">Navigate back to Fieldwire</li>\n<li data-list-item-id=\"e82616942f34cef34e557a388b340cd90\">Click on the <strong>Manage cost presets</strong> button, again, if necessary</li>\n<li data-list-item-id=\"ef5da1f10470ed7c00a08755502fabccd\">Click <strong>Import presets</strong>, if necessary</li>\n<li data-list-item-id=\"e528b74dc264a7f3382cfe4abfd1cd163\">Click <strong>Select file</strong> or drag and drop the spreadsheet from your computer's files</li>\n<li data-list-item-id=\"e74306e2c403db81f34d30281e05ea791\">See that the presets are automatically imported and created as specified in the spreadsheet.</li>\n</ol><p><img src=\"https://help.fieldwire.com/hc/article_attachments/34605778701457\" alt=\"2025-04-22_18-09-35 (1).gif\"></p><p> </p><p>Once you are done creating your presets, you're all set and ready to go in creating your change orders. Below is a short video of a change order created with presets:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/23265783519761\" alt=\"Change order presets 2.gif\"></p><p> </p><h2 id=\"h_01HAE41MZ0Q8402STFNTA59TCH\">Create a Change Order</h2><p><span style=\"font-weight: 400;\">To create a Change Order Draft, you must have the Manager permission within PM access. </span></p><p><span style=\"font-weight: 400;\">To create a new Change Order:</span></p><ol>\n<li data-list-item-id=\"e392b51f995613642dca0a61985b1bbc6\"><span style=\"font-weight: 400;\">Navigate to the Change orders tab</span></li>\n<li data-list-item-id=\"e056e6e926dd496317d2b5d733b129e2b\"><span style=\"font-weight: 400;\">Select <strong>+New change order</strong></span></li>\n<li data-list-item-id=\"e6c1a13ff14210a27606072a0535f0eca\">\n<span style=\"font-weight: 400;\">Enter the <strong>Name</strong> of your change order.</span><ul><li data-list-item-id=\"ebde99857444d261f05399c1535c25b4d\"><span style=\"font-weight: 400;\">You can add a <strong>Description</strong> of your change order if you'd like, though it is not mandatory.</span></li></ul>\n</li>\n<li data-list-item-id=\"ea096f1acab69540ac1c9fdfd9f0eeafe\"><span style=\"font-weight: 400;\">Click <strong>Create draft</strong></span></li>\n</ol><p><strong>Note:</strong> The <strong>Name</strong> of the Change Order can be adjusted later on in any status, not just <strong>Draft</strong>. This action can only be performed by Managers in the Change Order Creator's or Assignee’s company. To do so, click on the pencil icon by the Name once you've opened the Change Order.</p><p><span style=\"font-weight: 400;\"><img src=\"https://help.fieldwire.com/hc/article_attachments/18830256120091\" alt=\"Change_orders___Fieldwire_2.png\"></span></p><p> </p><p><span style=\"font-weight: 400;\">On the new change order, there are no required fields, but when it has been created, <strong>Details</strong> and <strong>Cost</strong> information can be added to it. </span>The change order is split up into 3 areas: <strong>header</strong> on top, <strong>Details</strong> on the right, and <strong>Cost</strong> information on the left.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18830242569371\" alt=\"59d0c496-1a49-415b-b765-1477b74aeae6.png\"></p><p> </p><p>Within <strong>Details</strong> are the Reason, Reference no. [number], Schedule Impact and the Description field.</p><p>The Description field allows you to add additional information that you may not have had originally or that cannot be capture in other fields. As you add more text to the Description field, it automatically expands to fit your content, making it easier to review longer descriptions without scrolling inside a small text box.</p><p>Cost information is further split up by the cost sections on top (Materials, Labor, Equipment, Subcontractor), Cost markups, Cost summary, Backup documents, and Notes.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18830374288923\" alt=\"2bae8fa2-7701-488d-a4a2-ea629f72dad9.png\"></p><p> </p><p>The primary difference between the cost sections is the Unit types that are available. </p><ul>\n<li data-list-item-id=\"e7215b1f9af2d5cc1218d31a67ebbf945\">Under the \"<strong>Materials</strong>\" section, in the \"<strong>UNIT TYPE</strong>\" dropdown, you can select, \"Each\", \"Linear feet\", \"Square feet\", \"Square yards\", etc. </li>\n<li data-list-item-id=\"e0835f0b91c6b338eecd9dc4be5087ce7\">Under the \"<strong>Labor</strong>\" and \"<strong>Equipment</strong>\" sections, in the \"<strong>UNIT TYPE</strong>\" dropdown, you can select, \"Hours\", \"Days\", \"Weeks\", etc.</li>\n<li data-list-item-id=\"e30d3a9d04559819046cc763453d93009\">Under the \"Subcontractor\" section, in the \"<strong>UNIT TYPE</strong>\" dropdown, you can select multiple unit types (e.g., Each, Linear Feet, Square Meters), allowing for more flexible and accurate cost tracking.</li>\n</ul><p>The cost sections can be marked up independently or together in the cost markups. A final markup can also be applied to the change order which is essentially a markup on top of a markup, most commonly used for a bond, insurance, etc.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/27915796400785\" alt=\"7efae1f6-9259-40ee-bcbc-b358314db148.png\"></p><p> </p><p>If you are looking to provide additional documentation for your change order, you can add an attachment. To do so:</p><ol>\n<li data-list-item-id=\"e9e4ca8fb43ab17836534b471a903d74f\">Click the <strong>+ Add attachment</strong> button under Backup documents</li>\n<li data-list-item-id=\"e78410ce983fadeca5abbd39afa83469c\">\n<span style=\"font-weight: 400;\">Choose either <strong>Attach from Files</strong> or <strong>+ Upload new file</strong> </span><ul><li data-list-item-id=\"ee4a463ec18f0b58394476b4765acb42e\"><span style=\"font-weight: 400;\">When attaching existing Files from your project to the Submittal, you can simply click within the search field, and you'll see a list of all of your files currently on the project. You can scroll up and down this list to locate the correct one.</span></li></ul>\n</li>\n</ol><p><span style=\"font-weight: 400;\"><img src=\"https://help.fieldwire.com/hc/article_attachments/34640181539601\" alt=\"2025-04-23_17-24-06 (1).gif\"></span></p><p> </p><h3 id=\"h_01JYM7S3YY9DFP1QKX3Q8M5DQ1\">Linking to a Change Order</h3><p><span style=\"font-weight: 400;\">You can link existing Change Orders together or create a new Change Order from an existing one. This feature supports keeping related documents organized and easily accessible, making it easier to communicate dependencies or related scope.</span></p><p><span style=\"font-weight: 400;\"><img src=\"https://help.fieldwire.com/hc/article_attachments/35836904641041\" alt=\"2025-06-02_15-14-55 (1).gif\"></span></p><p> </p><p>You can also link RFIs, Tasks, and Forms to Change Orders. Linking these items to Change Orders avoids manual input and streamlines the process as well as reduces the duplication of entry. When you click a form link from a Change Order:</p><ol>\n<li data-list-item-id=\"ef5158d2aae4a11284939f69c21348bd6\">You are redirected to the Forms tab.</li>\n<li data-list-item-id=\"e47317310fca28d5442510359893915d3\">The form then opens in a modal within the Forms tab.</li>\n<li data-list-item-id=\"e932ef2f4d41327f0e2736270353ccf55\">A Back button appears in the modal’s top bar that returns you to the originating change order.</li>\n</ol><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 1470/734;\" src=\"https://help.fieldwire.com/hc/article_attachments/36576240467729\" width=\"1470\" height=\"734\"></figure><p> </p><p>Inversely, you can create a Change Order from an RFI:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/35934054573841\" alt=\"Create CO from RFI.gif\" width=\"1360\" height=\"970\"></p><p> </p><h2 id=\"h_01HADRP6QMG64VJBT6Q04TN9WX\">Request Cost</h2><p>When the change order is ready, a blue <strong>Send</strong> dropdown button will be available. By clicking the blue dropdown button, you'll see two options, <strong>Request cost</strong> and <strong>Submit for approval</strong>. This workflow will be going over the 'Request cost' option. </p><p>After selecting <strong>Request cost</strong>,</p><ol>\n<li data-list-item-id=\"e05cd42caec30ba1a3e5c04712611aecc\">Choose between assigning the Change Order to a <strong>Project user</strong> or an <strong>Email address</strong>,</li>\n<li data-list-item-id=\"e6ad5740058cae632ac878e981f1f2475\">Enter the <strong>Assignee</strong>\n</li>\n<li data-list-item-id=\"eb40d5608da34aee012438fde5a0365b3\">Add <strong>Watchers</strong> (optional)</li>\n<li data-list-item-id=\"ee80ff901d34d5df381aeb78a517b3052\">Add the <strong>Due date</strong> (optional)</li>\n<li data-list-item-id=\"e51a649724f2a9963681a0827ee333b0d\">Add an <strong>Email Message</strong> (optional)</li>\n<li data-list-item-id=\"ef018b74f06c01c4d4e843bda6362403e\">Click the blue <strong>Request</strong> button.</li>\n</ol><p><img src=\"https://help.fieldwire.com/hc/article_attachments/33036506015761\" alt=\"2025-02-27_13-48-30.png\"></p><p> </p><p>If you chose to assign the Change Order to a <strong>Project user</strong>, this will move the change order into the <strong>Requested</strong> status, and an email notification will be sent to the new Assignee directing them to add their costs and submit the change order in Fieldwire.</p><p>\n  <img src=\"https://help.fieldwire.com/hc/article_attachments/18830532744091\" alt=\"_Fieldwire_2__Change_Order_ABC-0004_has_been_requested_from_you_in_Fieldwire_-_bschantz_fieldwire_com_-_Fieldwire_Mail.png\">\n</p><p><br>If you're assigning the change order to an <strong>Email address</strong>, it will also move the Change Order into the <strong>Requested</strong> status, and the assignee will receive an email copy of the Change Order. In the email, they are provided with the name of the Change Order as well as instructions stating that they have been assigned this change order and to reply to the email with their cost impacts, which will send an email to the Creator of the Change Order so that the Creator can respond on the Assignee's behalf.</p><p>\n  <img src=\"https://help.fieldwire.com/hc/article_attachments/33036506018193\" alt=\"2025-02-27_14-02-28.png\">\n</p><p> </p><p><span style=\"font-weight: 400;\">Once the Change Order is assigned to the email address, you'll see that the Assignee field in the header is flagged to indicate that the they are an external user. In addition, this email address will appear in the activity feed and in any reports created.</span></p><p><span style=\"font-weight: 400;\"><img src=\"https://help.fieldwire.com/hc/article_attachments/33036506019345\" alt=\"2025-02-27_13-58-30.png\"></span></p><p> </p><p>Once an external email address is used, you'll be able to select it again when assigning a Change Order to an email address on all other Change Orders on the project. </p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/33036506021649\" alt=\"2025-02-27_13-47-06.png\"><span><span style=\"font-weight: 400;\"></span></span></p><p> </p><h3 id=\"h_01JN4D59DBZJ9ZJVY2A9FAR1PY\">Submit on behalf</h3><p>Once the change order is in the <strong>Requested</strong> status, the <strong>new</strong> <strong>Assignee</strong> will be able to:</p><ul>\n<li data-list-item-id=\"ed315da952dd111b22ffa7f279690e255\">Download a PDF copy of the fields on the change order</li>\n<li data-list-item-id=\"e1ffd8b64af3d9321920f312ff9d24303\">Add cost information directly to the PDF version if they have a PDF editor and email it back to the email address listed on the email they received</li>\n<li data-list-item-id=\"ece7f40ddc0681e5cca4da594960bc364\">Send the requested information by directly replying in the email they received. </li>\n</ul><p>Once the Creator of the Change Order receives the necessary information from the external user, they'll click on the <strong>Submit on behalf</strong> button.</p><p>\n  <img src=\"https://help.fieldwire.com/hc/article_attachments/33036475872273\" alt=\"2025-02-27_14-12-42.png\">\n</p><p> </p><p><span><span style=\"font-weight: 400;\">Once they do this, the fields of the Change Order will appear for the creator to fill out with the information they received. After</span></span><span><span style=\"font-weight: 400;\"> the information is filled out on the Change Order, the creator will click on the 'Submit on behalf' button again where they'll be able to assign the Change Order to a new person (or back to themselves), add Watchers, and fill in the Due date. Finally, the creator will click on the blue \"Submit\" button, which will transition the status from Requested to Pending approval.</span></span><span><span style=\"font-weight: 400;\"></span></span></p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/33036506025617\" alt=\"2025-02-27_14-21-42.png\"></p><p> </p><h2 id=\"h_01HADS5Z0HHYJP3VKPVDZM4HY1\"><span style=\"font-weight: 400;\">Submit for Approval</span></h2><p><span style=\"font-weight: 400;\">As opposed to selecting 'Request cost', you can also select 'Submit for approval' when the Change Order is in 'Draft' status. In this status, you'll fill in all of the necessary cost information as outlined above in the \"Create a Change Order\" section. Once the cost information has been entered, take the following steps:</span></p><ol>\n<li data-list-item-id=\"e74f6b3bec2044391f6b7b0fcafe2f62b\"><span style=\"font-weight: 400;\">Click on the <strong>Send</strong> dropdown button</span></li>\n<li data-list-item-id=\"e6d832268cdffaf6bf45c60e5d740e57d\"><span style=\"font-weight: 400;\">Select <strong>Submit for approval</strong> </span></li>\n<li data-list-item-id=\"ecc34a82c53fe006eba55b983b85b5db4\">Choose an <strong>Assignee</strong> <ul>\n<li data-list-item-id=\"e0739d5414f42b2ca64832a302f49a8ab\"><span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\"><strong>Project user</strong> provides a dropdown in the <strong>Assignee</strong> row allowing you to assign the Change Order directly to someone already on the project in Fieldwire</span></li>\n<li data-list-item-id=\"ece0e247e278968a32f6fa40d2e22847b\">\n<span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\"><strong>Email address</strong> provides a free text field in the <strong>Assignee</strong> row allowing you to assign the Change Order to external users not currently on the project</span><span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\"></span><ul><li data-list-item-id=\"e874d6ba044249057cd4480471a04a4f9\">\n<strong>CC</strong> is for when assigning a change order to an email address. This k<span style=\"color: #1d1c1d;\">eeps users who aren’t on Fieldwire informed on the status and progress of the change order.</span> </li></ul>\n</li>\n</ul>\n</li>\n<li data-list-item-id=\"e9674d27503703406cdfc44387b01dd67\"><span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\">Add <strong>Watchers, </strong>this is not required to submit the Change Order</span></li>\n<li data-list-item-id=\"e3c427235031e7440d02b5b8c8ae15938\"><span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\">Add the <strong>Due date</strong>, this field is not required to submit a Change Order</span></li>\n<li data-list-item-id=\"eb607b7c763447467654007b2536e08d7\"><span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\">Add an optional <strong>Message</strong></span></li>\n<li data-list-item-id=\"e4514eb938b494407f81d3fb42ce22d4e\">\n<span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\">Click <strong>Submit</strong></span><span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\"></span>\n</li>\n</ol><p><span style=\"font-family: -apple-system, BlinkMacSystemFont, 'Segoe UI', Helvetica, Arial, sans-serif;\"><img src=\"https://help.fieldwire.com/hc/article_attachments/35875404224273\" alt=\"Screenshot 2025-06-03 at 4.00.08 PM.png\" width=\"489\" height=\"455\"></span></p><p><span style=\"font-weight: 400;\">After the Change Order has been submitted, the status will change to 'Pending approval'.</span></p><p><span style=\"font-weight: 400;\"><img src=\"https://help.fieldwire.com/hc/article_attachments/18830747081627\" alt=\"Change_orders___Fieldwire_2.png\"></span></p><p> </p><h2 id=\"h_01HADSR2451M6RZEYPTSSKG100\"><span style=\"font-weight: 400;\">Send Rejection</span></h2><p>In the <strong>Pending approval</strong> status, the new Assignee can either <strong>Approve</strong> or <strong>Reject</strong> the change order, sending it back to the user that submitted it to them. This will transition the status to either Approved or Rejected respectively.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18830760724251\" alt=\"Change_orders___Fieldwire_2.png\"></p><p> </p><p>If <strong>Reject</strong> is chosen, you'll receive a pop-up that asks you to confirm that you do want to send the rejection to the submitter. Also, as indicated in the messaging in the pop-up, if you decide to reject the change order, Fieldwire will allow the submitter to create a revision.</p><p><span><img src=\"https://help.fieldwire.com/hc/article_attachments/18830760729115\" alt=\"Change_orders___Fieldwire_2.png\"></span></p><p> </p><h2 id=\"h_01HADT18N4SJ228BETQ80RVBWS\">Create Revision</h2><p>To create a revision, the Assignee must </p><ol>\n<li data-list-item-id=\"edd9c20100acdf88bf7c22c8b4b588eb5\">Click on the <strong>Create revision</strong> button</li>\n<li data-list-item-id=\"e6f5230c549ecd5dd06a55a8bfa22a715\">Choose the <strong>Assignee</strong>\n</li>\n<li data-list-item-id=\"e226853b4ba42d9b19c21650545b257d5\">Choose<strong> Watchers</strong>\n</li>\n<li data-list-item-id=\"e2f7847e1c2bf719a18b89890f79a4e58\">Select the <strong>Due date</strong>\n</li>\n<li data-list-item-id=\"e6d9c4a4917a6bdb749c44ef86db9f35c\">Click the <strong>Create revision</strong> button</li>\n</ol><p>If a revision is created, the user has the option to copy over the last version’s cost information and backup documents with the checkboxes as shown in the screenshot below, so they can build off of the previous revision or start from scratch. Once a revision is created, the status transitions from Rejected to Pending revision.</p><p><span><img src=\"https://help.fieldwire.com/hc/article_attachments/18832836838043\" alt=\"Change_orders___Fieldwire_2.png\"></span></p><p> </p><p>In the Pending revision status, a new revision of the cost table allows the Assignee to edit the content and add more Notes before they resubmit as well as add more Backup documents. </p><p><strong>Note:</strong> Notice in the screenshot below that \"rev. 1\" is next to \"Cost\" to indicate that this is the 1st revision.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/18832836841371\" alt=\"Change_orders___Fieldwire_2.png\"></p><p> </p><p>In addition, Past revisions can be seen beneath the current revision in case you want to reference past responses or submissions. Once the change order is ready to resubmit, Managers can submit for approval again transitioning it from Pending revision to Pending approval. The Pending approval workflow recommences with the new revision.</p><p><span><img src=\"https://help.fieldwire.com/hc/article_attachments/18832799245723\" alt=\"Change_orders___Fieldwire_2.png\"></span></p><p> </p><h2 id=\"h_01HAE307E8362N6Y32KDTMS3N7\">Send Approval</h2><p>Once again, in the <strong>Pending approval</strong> status, the new Assignee can either Approve or Reject the change order. </p><p><span><img src=\"https://help.fieldwire.com/hc/article_attachments/18830760724251\" alt=\"Change_orders___Fieldwire_2.png\"></span></p><p> </p><p>If the new Assignee clicks 'Approve', they will see one more pop-up to confirm their action. By clicking the blue \"Send\" button, the status of the change order will be changed to \"Approved\", the change order process is complete. </p><p><span><img src=\"https://help.fieldwire.com/hc/article_attachments/18832836847131\" alt=\"Change_orders___Fieldwire_2.png\"></span></p><p> </p><p>Once a Change Order is Approved, Managers in the creator’s company can streamline their workflow and minimize rework with the option to reopen “Approved” change orders, which will move them back to the \"Pending approval” status.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/33887809168657\" alt=\"2025-03-28_13-39-44.png\"></p><p> </p><p>When a Lead company is set on the project, users in the Lead company can choose to <strong>Respond on behalf</strong> of the Assignee. When clicking on the Respond on behalf button, the user in the Lead company will see the options to either Approve or Reject the Change Order. <strong>Users who are not in the Lead company will not see this option to Respond on behalf even if they are ones to submit the Change Order to the Lead company user.</strong></p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/38667489921169\" width=\"2940\" height=\"1468\"></figure><p> </p><p>Whether choosing <strong>Approve</strong> or <strong>Reject</strong>, the user will see a pop-up that will prompt them to add Notes and add an attachment if they would like as well as select the date the response was received. The <strong>Response received</strong> field is mandatory, which ensures project records stay precise and up to date. The user can then click <strong>Respond</strong> to either approve or reject the change order.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 1470/734;\" src=\"https://help.fieldwire.com/hc/article_attachments/38667462116625\" width=\"1470\" height=\"734\"></figure><p> </p><h2 id=\"h_01JPN2ZCHM168V854G287A7EFN\">Void</h2><p>If a Change Order is made ‘Void’ it will make the Change Order uneditable, since it will adopt a ‘Void’ status. However, you can 'Unvoid' a Change Order and restore it to its prior state. Unvoiding a change order will revert the assignee to the original one even if they weren't the assignee when the change order was voided. These actions are all captured in the change order's \"Activity\" tab.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/33827337840785\" alt=\"Screenshot 2025-03-24 at 7.19.12 AM.png\"></p><p> </p><h3 id=\"h_01HAE3D7TNA4ZNGKEBYG4AWQ4M\">More Information</h3><ul>\n<li data-list-item-id=\"ee3a076b98fd3a7fce75718454519f8c6\"><a href=\"https://help.fieldwire.com/hc/en-us/articles/7160473659419\" target=\"_blank\" rel=\"noopener noreferrer\">The Submittals Workflow in Fieldwire</a></li>\n<li data-list-item-id=\"e3f30ce96483abbcfa30f2c72a9ce8f09\"><a href=\"https://help.fieldwire.com/hc/en-us/articles/4408422176539\" target=\"_blank\" rel=\"noopener noreferrer\">Introduction to RFIs in Fieldwire</a></li>\n<li data-list-item-id=\"e8215fdd6c47df2d615adf53a624e8ae8\"><a href=\"https://help.fieldwire.com/hc/en-us/articles/9736608004763\" target=\"_blank\" rel=\"noopener noreferrer\">How to Enable PM and Manage Companies on a Project</a></li>\n</ul><p class=\"wysiwyg-text-align-center\"><em>Change Orders in Fieldwire</em></p><figure class=\"wysiwyg-media\"><div data-oembed-url=\"https://youtu.be/xrxo_iKBPqk?feature=shared\"><iframe src=\"//www.youtube-nocookie.com/embed/xrxo_iKBPqk?feature=shared\" frameborder=\"0\" allowfullscreen=\"\" allow=\"encrypted-media\" style=\"width: 100%; aspect-ratio: 16 / 9;\"></iframe></div></figure>","user_segment_ids":[]}}