{"article":{"id":28814456021137,"url":"https://fieldwirelabs.zendesk.com/api/v2/help_center/en-us/articles/28814456021137.json","html_url":"https://help.fieldwire.com/hc/en-us/articles/28814456021137-Introduction-to-Budget-in-Fieldwire","author_id":412807087952,"comments_disabled":true,"draft":false,"promoted":true,"position":0,"vote_sum":2,"vote_count":6,"upvote_count":4,"downvote_count":2,"section_id":28814459146129,"created_at":"2024-09-30T20:47:28Z","updated_at":"2026-06-09T16:58:21Z","name":"Introduction to Budget in Fieldwire","title":"Introduction to Budget in Fieldwire","source_locale":"en-us","locale":"en-us","outdated":false,"outdated_locales":[],"edited_at":"2026-05-01T15:45:36Z","user_segment_id":null,"permission_group_id":524746,"content_tag_ids":[],"label_names":["PM","budget","product_management","coût","navýšení_nákladů","Sobrecostes","narzut","costi","Kostenmarkierungen","ricarichi","navýšenie_nákladov","költségfelár","cost_markups","Lisäkustannus","kostenmarge","avancetillæg","Presupuesto","video_budgets-in-fieldwire"],"body":"<h2 id=\"h_01J9N1QPTMKCF79Y05K9K7XRQY\">Overview</h2><p>The Budget module is the newest addition to Fieldwire's suite of Project Management tools, designed to provide a clear and structured way to manage the financial aspects of construction projects. By setting cost expectations and detailing all necessary expenditures, using the Budget module helps ensure projects stay on track financially from start to finish.</p><p>It enables thorough planning for direct costs, like materials, labor, equipment, and subcontractors, as well as indirect costs such as overheads, insurance and permits, while offering a way to monitor expenses and align them with the project's financial goals. This helps to avoid unforeseen costs and ensures transparency for all stakeholders through the process.</p><p>In order to acquire this feature on your account, you can <a href=\"https://www.fieldwire.com/demo/pm/\">schedule a demo with our sales team</a> or you can purchase it with <a href=\"https://www.fieldwire.com/pricing/\">Business Plus.</a> If you are already on Business Plus, the Budget module will be automatically added to your Account.</p><p> </p><h2 id=\"h_01J9N1QZ3F669FKASMZF3JBFFA\">Table of Contents</h2><ul>\n<li data-list-item-id=\"ea091a945733ec823cac7dafdd8bf348c\"><a href=\"#h_01J9N3AZQS2NKTBPHGF2AEWC1N\">How to Enable PM on a Project</a></li>\n<li data-list-item-id=\"e732b08405f768f8ba5ffae315eac6598\">\n<a href=\"#h_01J9N3FXNF1KGKPQ97378KG7SK\">Budget Permissions</a><ul><li data-list-item-id=\"e77dadadd4f5cb039d8586fd58188c62e\"><a href=\"#h_01J9N3GRPJFZV2CPC06003A445\">How to set a Lead Company</a></li></ul>\n</li>\n<li data-list-item-id=\"e132fe75f90cbdcc72455f67be913c203\"><a href=\"#h_01K462EN6EHJKVBAQKBG16YFGQ\">The Budget Tab</a></li>\n<li data-list-item-id=\"e443d67346827c6ad46ea5e4a2658bef0\">\n<a href=\"#h_01KQJ0SBPWQVBAAPRXE8MVND8D\">Production Tracking in Budget</a><ul>\n<li data-list-item-id=\"ede2adf58ca6cc6f25765db00f1582e62\"><a href=\"#h_01KQJ0WN0N3RX95RZ39WVJM5B0\">What is Production Tracking?</a></li>\n<li data-list-item-id=\"eaa70bd6d967e30f4cf34dcea331c8076\"><a href=\"#h_01KQJ0WV986V98MYCHYQC5CXRD\">How to Enable Production Tracking</a></li>\n<li data-list-item-id=\"e2b78b02768cd2d864c172c38f44f1aee\"><a href=\"#h_01KQJ0X19TZW20CAE7MEFXCE3N\">What Changes When Enabled</a></li>\n<li data-list-item-id=\"e63a6deca3c461da7a90b17d1969fb3ce\"><a href=\"#h_01KQJ0X5C2XNXF20FNZFFNJVSV\">Working with Production Items</a></li>\n<li data-list-item-id=\"ec772e9aef37a41ebb4790365a26e2426\"><a href=\"#h_01KQJ13GVYJNTMKD86BEMCYXQT\">Create Production Items from Tasks or Forms</a></li>\n<li data-list-item-id=\"e78c750fe272194221d61a9d17c9988ad\"><a href=\"#h_01KQJ144G4CCF15BFP1ZEVZB4C\">Import &amp; Export Behavior</a></li>\n<li data-list-item-id=\"edd8d7063485ff37ca3f3af402eeb67fa\"><a href=\"#h_01KQJ14P66X5ZXQB2GYTPEWR6E\">Key Details</a></li>\n</ul>\n</li>\n<li data-list-item-id=\"e1841023e221ca5c8a2a591f32caa7431\">\n<a href=\"#h_01J9N5KE05QY9W651Y3MKWRDNY\">Set up Cost Codes</a><ul><li data-list-item-id=\"edf9a1ef39f9535e8bf5cd74eae53d261\"><a href=\"#h_01J9N5KE056WD47QAHYEMPGM1E\">Import Cost Codes</a></li></ul>\n</li>\n<li data-list-item-id=\"e434e1d12bc75b8e36b72fc0face85d92\">\n<a href=\"#h_01J9N3ZCBP0R98FCKPFQPVX2QY\">Create (or Import) Budget Line Items</a><ul><li data-list-item-id=\"ea13cfb35ee651866c7b693e3e0dcd81b\"><a href=\"#h_01J9N7CQEQ0E8FNTAXZTEHR0B5\">Import Budget Line Items</a></li></ul>\n</li>\n<li data-list-item-id=\"ec170252b0cfe46109afbbe80ac41e38e\"><a href=\"#h_01J9N7KM8A142FYR3TKXNM3KQT\">Lock/Unlock Budget</a></li>\n<li data-list-item-id=\"e5fa2702425ee4424ab31bd4dbc130eef\"><a href=\"#h_01K6G4KNSDBAGFPW0JYZ6S32SX\">Activity Feed</a></li>\n<li data-list-item-id=\"e9e0c698c35febbba9bbef7ae9208fb4c\"><a href=\"#h_01J9P967ERJCME5VQAHZQV5PN4\">Subcontractors Setup</a></li>\n<li data-list-item-id=\"e05f66b031c6b50187df04ae89c086126\">\n<a href=\"#h_01J9P9YF3Z5JGN4V5NEQ9KH7TT\">Change Orders and Budget</a><ul><li data-list-item-id=\"ebe0bd91d4f18bb5c10a313006a755d80\"><a href=\"#h_01J9PREQ4102TBFMSZWWEB0DKX\">Subcontractor Change Orders</a></li></ul>\n</li>\n<li data-list-item-id=\"e64ce112f625c2b1de1817571b3f26a5d\">\n<a href=\"#h_01J9QM7Y1DNDCP7T1SC3HSXQ5T\">Actual Cost</a><ul><li data-list-item-id=\"ef7bd5c813c921a8666bf45f35a2a4ef7\"><a href=\"#h_01K848AGQWBGS9SSB2ZF2TABTC\">Import Actual Costs</a></li></ul>\n</li>\n<li data-list-item-id=\"ee88d227a9bfa04090900f5f20805fd88\"><a href=\"#h_01JW9PPRQ8KYH0YA8WMPEB2271\">Deleting Line items</a></li>\n<li data-list-item-id=\"ec9894f092d1b2b33e02b6223991c857c\"><a href=\"#h_01JQEH4VW4NRSAFXFJG9VYKDYC\">Editing and Deleting 'Actual Cost'</a></li>\n</ul><p> </p><h2 id=\"h_01J9N3AZQS2NKTBPHGF2AEWC1N\">How to Enable PM on a Project</h2><p>For information on companies and how to enable PM on a project, please see this article:<a href=\"https://help.fieldwire.com/hc/en-us/articles/9736608004763\" target=\"_blank\" rel=\"noopener noreferrer\"> How to Enable PM and Manage Companies on a Project</a>.</p><p> </p><h2 id=\"h_01J9N3FXNF1KGKPQ97378KG7SK\">Budget Permissions</h2><p>To access the Budget module, you must set up a company in the Project People tab, and set it as the Lead company. Only Admins in the Lead company will have access to the Budget module.</p><p> </p><h3 id=\"h_01J9N3GRPJFZV2CPC06003A445\">How to set a Lead Company</h3><p>To ensure that only your \"company\" can access and manage the Budget, set it as the Lead Company. To get started, you'll first want to go to the project People tab and then click on \"Set lead company\" for the company that you want to be considered the \"lead\".</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29035754140561\" alt=\"2024-10-08_09-39-27.png\"></p><p> </p><p>After clicking on \"Set lead company\", you'll get a pop-up that indicates what the users in the Lead company can do vs users in the \"Other companies\" that were not designated to be the lead. For example, users in the Lead company can access and manage the Budget, but users in the 'Other companies' do not have access to the Budget module.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017198131345\" alt=\"Screenshot 2024-10-08 at 2.57.18 PM.png\"></p><p> </p><p>After you click the blue \"Set lead company\" button, you'll see the lead company indicated with a crown icon and \"Lead company\" next to it.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29044062365713\" alt=\"2024-10-08_15-22-54.png\"></p><p> </p><p>If you mistakenly choose the incorrect lead company, any Admin on the project can change it by doing the following:</p><ol>\n<li data-list-item-id=\"e91c0c847a934ee57b6239d15136172ad\">Click the three dots (⋮) next to the invite user(s) icon</li>\n<li data-list-item-id=\"ea800f6b35c2cd31901805a7d31a314af\">Select <strong>Remove lead company</strong>\n</li>\n</ol><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1472;\" src=\"https://help.fieldwire.com/hc/article_attachments/44639975347089\" width=\"2940\" height=\"1472\"></figure><p> </p><h2 id=\"h_01K462EN6EHJKVBAQKBG16YFGQ\">The Budget Tab</h2><p>The Budget tab is only accessible by Admins in the Lead Company. The purpose to maintain privacy for the Lead Company as they could potentially have sensitive financial data in that tab.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 1470/734;\" src=\"https://help.fieldwire.com/hc/article_attachments/38665858748049\" width=\"1470\" height=\"734\"></figure><p> </p><p>The headers in this tab provide a high-level overview on the different columns and the data displayed in the Budget tab. More specifically, these columns are defined below: </p><ol>\n<li data-list-item-id=\"e955bcc486414c0986c2038b445ac043b\">Budget items/cost codes</li>\n<li data-list-item-id=\"ef4465fceb4fd27e9ab79f17b4ef7d769\">Budget:<ul>\n<li data-list-item-id=\"edc4a62c11a967ac4fdbc5f12022bb1f6\">Original = Original value of Lead company’s scope of work</li>\n<li data-list-item-id=\"ef707049620f36244bd17b213514c9449\">Current = Original contract + Lead company’s approved change orders</li>\n<li data-list-item-id=\"e3967564a90fa20d24ca4bf3b421c33f7\">Pending = Lead company’s pending change orders</li>\n</ul>\n</li>\n<li data-list-item-id=\"ea9a59ff9fa75d5ea81616bb3b56de3dd\">Cost:<ul>\n<li data-list-item-id=\"e20afe95de38528669d37da73cd73a254\">Original = Original value of a subcontractor company’s scope of work</li>\n<li data-list-item-id=\"e9929a70a34298fbd2d4d6897c3ee32ce\">Current = Cost: Original contract + subcontractor’s approved change orders</li>\n<li data-list-item-id=\"e875b17d265c10b93495c44963b13c8fd\">Pending = Subcontractor’s pending change orders</li>\n<li data-list-item-id=\"eb220700e37aca8581b2b9dcca207da89\">Projected = Value of costs Lead company is projected to spend</li>\n<li data-list-item-id=\"e7765bd8c2d7fbd9110f6fce28e6b098d\">Actual = Cost incurred to date</li>\n</ul>\n</li>\n<li data-list-item-id=\"ea45214f301a204f04aafca23d7799073\">Forecast:<ul>\n<li data-list-item-id=\"ebdb1cb712228b4200a3f5bfff6b89e7c\">Current over/under = Current budget - Current cost</li>\n<li data-list-item-id=\"ebeedc9d7310b3d6db6852f671b00dd43\">Projected over/under = (Original + Pending) budget - Projected cost</li>\n<li data-list-item-id=\"e64c716885426ccd60c641af704c45619\">Actual over/under = Current budget - Actual cost</li>\n</ul>\n</li>\n</ol><p>In addition, you'll notice the high-level analytics bar up at the top where you'll be able to easily see the projected budget minus the projected cost to provide you with the projected over/under. This puts the most important budget metrics front and center and can help project managers as well as executives quickly spot trends and make data-driven decisions.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/38665858748433\" width=\"2940\" height=\"1468\"></figure><p> </p><h2 id=\"h_01KQJ0SBPWQVBAAPRXE8MVND8D\">Production Tracking in Budget</h2><p>Fieldwire’s Budget module includes <strong>Production Tracking</strong>, an optional feature that allows teams to track progress using <strong>quantities and units</strong>, rather than only total dollar amounts.</p><iframe src=\"https://drive.google.com/file/d/1SvFdKaCDNKFXaKHO5nvZkmlvlR5AL03X/preview\" width=\"640\" height=\"480\"></iframe><p> </p><h3 id=\"h_01KQJ0WN0N3RX95RZ39WVJM5B0\">What is Production Tracking?</h3><div>\n<p>Production Tracking enables you to:</p>\n<ul>\n<li data-list-item-id=\"eec62da3db9c64670c32ad7c1c33173be\">Define Budget line items using <strong>Quantity × Unit Cost</strong> instead of lump sum values</li>\n<li data-list-item-id=\"edee5bad99d16e08136ef2124a7346db5\">Track installed or completed work directly within the Budget</li>\n<li data-list-item-id=\"e737b254f032fa5163d1377496d5e763a\">Monitor <strong>progress (%)</strong> against the total scoped quantity</li>\n</ul>\n<p>This is useful for teams tracking work such as:</p>\n<ul>\n<li data-list-item-id=\"e7203e2cbecf7bafce14d6b34d1feaea5\">Linear feet installed</li>\n<li data-list-item-id=\"ea66cdd6f276140e68777898ad7f49630\">Cubic yards poured</li>\n<li data-list-item-id=\"eb546dbf66f1f3eecc8f2a6c0de91edda\">Labor hours completed</li>\n</ul>\n</div><h3 id=\"h_01KQJ0WV986V98MYCHYQC5CXRD\">How to Enable Production Tracking</h3><div>\n<p>Production Tracking is <strong>optional and project-specific</strong>.</p>\n<p>To enable it:</p>\n<ol>\n<li data-list-item-id=\"e3069b9f92fe761462b55dc0669edb62b\">Navigate to the <strong>Budget tab</strong>\n</li>\n<li data-list-item-id=\"e5f920d83d4d66011bdbb088e03dc9df6\">Click <strong>Budget Settings</strong>\n</li>\n<li data-list-item-id=\"e4c407feddf73557e195f224b6b104e8c\">Select <strong>Budget customization</strong>\n</li>\n<li data-list-item-id=\"e1ed122c5d3be9989ca182f5b6d62a22a\">Toggle on:<ul>\n<li data-list-item-id=\"e640f393d66f13bfac3e6032e2b5746f9\">\n<strong>Quantity Tracking</strong> (Quantity, Unit Type, Unit Cost)</li>\n<li data-list-item-id=\"eb6b0e2464955e748c13f48e5df588871\">\n<strong>Production Tracking</strong> (Production, % Complete)</li>\n</ul>\n</li>\n<li data-list-item-id=\"eb83cf91863f2d683019c940b95a7bb4f\">Click <strong>Confirm</strong>\n</li>\n</ol>\n<p>You can enable this:</p>\n<ul>\n<li data-list-item-id=\"ef187acf79f000ad61196d366a7332dd8\">During initial Budget setup</li>\n<li data-list-item-id=\"eceb184c7c1ce83e037e58bf5feb5e9fc\">Or at any time on an existing project</li>\n</ul>\n<figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 1470/736;\" src=\"https://help.fieldwire.com/hc/article_attachments/46276387507857\" width=\"1470\" height=\"736\"></figure><p> </p>\n</div><h3 id=\"h_01KQJ0X19TZW20CAE7MEFXCE3N\">What Changes When Enabled</h3><div>\n<p>When Production Tracking is enabled, the following updates occur:</p>\n<p><strong>New fields on Budget line items:</strong></p>\n<ul>\n<li data-list-item-id=\"effd51b35075e83dba23476dbda16d9d8\">Quantity</li>\n<li data-list-item-id=\"e5af432db0d87629e2602a2ac45d996a6\">Unit Type</li>\n<li data-list-item-id=\"e20f56d1c6ce39850b18fe89740692160\">Unit Cost</li>\n</ul>\n<p><strong>New columns in the Budget table:</strong></p>\n<ul>\n<li data-list-item-id=\"ecaec82ed8520d95a5f679dd39669f8a5\">Production</li>\n<li data-list-item-id=\"e0dbf0712da6f6ae3f4c3fa49f86aded0\">% Complete</li>\n</ul>\n<p><strong>Automatic calculations:</strong></p>\n<ul>\n<li data-list-item-id=\"e41a11c965c8d774c408e9fd65c7fdc94\">Original Budget = Quantity × Unit Cost</li>\n<li data-list-item-id=\"e01a6935abbd4ccd5fd1c7c40c8bab27e\">% Complete = Total Produced Quantity ÷ Total Budgeted Quantity</li>\n</ul>\n<figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 1470/736;\" src=\"https://help.fieldwire.com/hc/article_attachments/46276387508241\" width=\"1470\" height=\"736\"></figure><p> </p>\n</div><h3 id=\"h_01KQJ0X5C2XNXF20FNZFFNJVSV\"><span style=\"font-weight: 400;\">Working with Production Items</span></h3><div>\n<p>Production items allow you to log progress against a Budget line item.</p>\n<p>To create a production item:</p>\n<ol>\n<li data-list-item-id=\"e5cd5dfe49216085f9612b9173794c8ae\">Click on a Budget line item</li>\n<li data-list-item-id=\"e15c2048e38a9105ddeb17894322890dd\">Open the <strong>Production</strong> section</li>\n<li data-list-item-id=\"ef472d7847787ff3e5368854412967cd2\">Click <strong>+ New production</strong>\n</li>\n<li data-list-item-id=\"e807558a7e20587dbe120461b597224b3\">Enter:<ul>\n<li data-list-item-id=\"ea246fc76340d613af175e6dc01a4e3c7\">Name (e.g., “April 30 Progress”)</li>\n<li data-list-item-id=\"e9b2bedf6f7fcce844643d50f1d5300c0\">Quantity completed</li>\n<li data-list-item-id=\"ece81f6785b841c767581de180cb1531e\">Optional attachments, Tasks, or Forms</li>\n</ul>\n</li>\n<li data-list-item-id=\"e073d264357f428c49d7f087c89ff983c\">Click <strong>Create</strong>\n</li>\n</ol>\n<p><strong>Result:</strong></p>\n<ul>\n<li data-list-item-id=\"ed570132dc36b794e9b6dc7ac2b8efd93\">The Production column updates automatically</li>\n<li data-list-item-id=\"ee6d3cadece55d46cf51fb30af0945b78\">% Complete is recalculated</li>\n</ul>\n</div><h3 id=\"h_01KQJ13GVYJNTMKD86BEMCYXQT\"><span style=\"font-weight: 400;\">Create Production Items from Tasks or Forms</span></h3><div>\n<p>Production items can also be created outside of the Budget:</p>\n<ul><li data-list-item-id=\"e65bf98b1502b9dca7f374bf80653e10a\">From a <strong>Task</strong>\n</li></ul>\n<figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1472;\" src=\"https://help.fieldwire.com/hc/article_attachments/46276342665873\" width=\"2940\" height=\"1472\"></figure><p> </p>\n<ul><li data-list-item-id=\"e3c12596525d67a9988afce0a98a26238\">From a <strong>Form</strong>\n</li></ul>\n<figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1472;\" src=\"https://help.fieldwire.com/hc/article_attachments/46276342666001\" width=\"2940\" height=\"1472\"></figure><p> </p>\n<p>When created this way:</p>\n<ul>\n<li data-list-item-id=\"e906837cbbcdebe637d584b4df35c983a\">The production item is automatically <strong>linked back to the Budget line item</strong>\n</li>\n<li data-list-item-id=\"ef0f9a8336e178f89f2fb188c3f9e2fba\">Provides <strong>traceability between field work and budget progress</strong>\n</li>\n</ul>\n</div><h3 id=\"h_01KQJ144G4CCF15BFP1ZEVZB4C\"><span style=\"font-weight: 400;\">Import &amp; Export Behavior</span></h3><div>\n<p>When Production Tracking is enabled:</p>\n<ul>\n<li data-list-item-id=\"e07f93f3c3eee7bb06124c6cbf9fca885\">Import templates include:<ul>\n<li data-list-item-id=\"e01d1bb5cec60553df73e028f07c562f4\">Quantity</li>\n<li data-list-item-id=\"e8b0fd0cba8b8a8ddd4779695ae496493\">Unit Type</li>\n<li data-list-item-id=\"ee5c371c6869da4d6d9f4c1023e1abd1c\">Unit Cost</li>\n<li data-list-item-id=\"ef8306351399b9f476f45f3b802d4e418\">Production</li>\n<li data-list-item-id=\"eac283e54733a7d9010a5ff3ce2d16e4d\">% Complete</li>\n</ul>\n</li>\n<li data-list-item-id=\"ea66f29f482e5bebc7705c06748c7bb6f\">CSV/Excel exports include the same fields</li>\n</ul>\n<p>When disabled:</p>\n<ul><li data-list-item-id=\"e8de41a5e4ad457885f52e74773bfad3e\">Import/export formats remain unchanged</li></ul>\n</div><h3 id=\"h_01KQJ14P66X5ZXQB2GYTPEWR6E\">Key Details</h3><div>\n<p>Existing budgets are preserved:</p>\n<ul>\n<li data-list-item-id=\"ea0b3743c4b77d80a7880c2480445e7bb\">Quantity = 1</li>\n<li data-list-item-id=\"e1ec33825f96fa4ada46f5f237092af9a\">Unit Type = “Lump Sum”</li>\n<li data-list-item-id=\"e7b8b45e9192be926c67197be66782e61\">Unit Cost = Original Budget value</li>\n</ul>\n<p>Disabling Production Tracking:</p>\n<ul>\n<li data-list-item-id=\"e256668b4962653803f7284ea6fdc838a\">Hides quantity and production columns</li>\n<li data-list-item-id=\"ef6e4c28864d0abeac43a8ad60f2944fa\">Does <strong>not delete data</strong>\n</li>\n</ul>\n<p>Budget lock behavior remains unchanged:</p>\n<ul><li data-list-item-id=\"ed928a3b2a6fc50a5e7b4300748a3e10e\">Quantity fields become <strong>read-only when locked</strong>\n</li></ul>\n<p> </p>\n</div><h2 id=\"h_01J9N5KE05QY9W651Y3MKWRDNY\">Set up Cost Codes</h2><p>Cost codes are required to set up your Budget and can be used to connect line items with Change orders. On initial set up of the Budget module for your project, you will be prompted to 'Manage cost codes':</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017213461649\" alt=\"2024-10-08_15-10-02.png\"></p><p> </p><p>After initial set up, you can still 'Manage cost codes' from within the Budget:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017198136209\" alt=\"2024-10-08_15-59-55.png\"></p><p> </p><p>You can add codes to create Budget and Change Order line items manually, starting with adding a new cost group:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017213463953\" alt=\"2024-10-08_15-12-01.png\"></p><p> </p><p>Then add your codes under the cost group:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017198140305\" alt=\"2024-10-08_15-14-23.png\"></p><p><strong>Note: </strong>Cost codes <strong>cannot be deleted</strong> when they are used in a budget line item or when they are used in ANY change order.</p><p> </p><h3 id=\"h_01J9N5KE056WD47QAHYEMPGM1E\">Import Cost Codes</h3><p>It is possible to import cost codes by uploading an Excel file. Fieldwire provides a template to get started, which can be downloaded from the import modal seen below.</p><p>When importing cost codes from an existing .xls or .xlsx file, please make sure Tier 1 and Tier 2 code cells are stored as 'text.' If the cell is formatted as a 'number' instead of 'text', you will receive an error code when you upload it. This cell formatting is what is used in the template to ensure that if your code starts with a '0', such as \"01\", Excel does not remove the \"0\" and makes it appear as \"1.\"</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017198142225\" alt=\"2024-10-08_15-24-38 (1).gif\"></p><p> </p><h2 id=\"h_01J9N3ZCBP0R98FCKPFQPVX2QY\">Create (or Import) Budget Line Items</h2><p>Once the company and cost codes are set up, it is time to start creating the Budget line items. On first set up, this will be the third step, and you will have the option to manually add new budget line items, or import your line items from an Excel file.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017213468049\" alt=\"2024-10-08_15-44-59.png\"></p><p>Budget line items consist of the following:</p><ul>\n<li data-list-item-id=\"e447ea1c4b72aeadb35787c8a07a10b45\">Cost Code</li>\n<li data-list-item-id=\"e68a1ccf267c2371f2a1bb0c94b8299c9\">Cost Type</li>\n<li data-list-item-id=\"e09acad23072b966b5d76c9c6b25aa8e3\">Original Contract Value</li>\n</ul><p><strong>Note:</strong> Cost codes can have multiple cost types</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017213468561\" alt=\"2024-10-08_16-24-59.png\"></p><p> </p><h3 id=\"h_01J9N7CQEQ0E8FNTAXZTEHR0B5\">Import Budget Line Items</h3><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017198148241\" alt=\"2024-10-08_15-50-31 (1).gif\"></p><p> </p><p>If you choose to import your Budget line items, you can also download a template, to ensure your Excel file is formatted correctly, from within the 'Import budget' modal:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017213470993\" alt=\"2024-10-08_15-46-41.png\"></p><p> </p><p>Once you have completed the three initial steps to set up your Project's Budget, the set up steps will be replaced by your new Budget. You can still add new line items and import your Budget:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29017198151185\" alt=\"2024-10-08_16-20-11.png\"></p><p> </p><p><strong>Note:</strong> Budget line items <strong>cannot be deleted</strong> when they are assigned to a subcontractor, they are used in a change order, or when they are used in an actual cost.</p><p> </p><h2 id=\"h_01J9N7KM8A142FYR3TKXNM3KQT\">Lock/Unlock Budget</h2><p>To lock the original Budget and start assigning items to subcontractors:</p><ol>\n<li data-list-item-id=\"e3fd718290fd8690a03ecf47b37379017\">Click on the blue <strong>Lock budget</strong> button on the right-hand side of the screen.</li>\n<li data-list-item-id=\"ec7a63274833c0be1b0c0bbb4c6781554\">On the new pop-up, ensure the budget number looks correct</li>\n<li data-list-item-id=\"e22dc56721ab72295953f228ccae09542\">Click <strong>Lock budget</strong> on the new pop-up</li>\n</ol><p>If you need to edit the Original Budget and/or Original Cost values, you will still be able to do so:</p><ol>\n<li data-list-item-id=\"e32e82cc8de88461c2e6604dfc17d800a\">Click <strong>Unlock budget</strong>\n</li>\n<li data-list-item-id=\"e8e8c214d84887208146630868cbaa68a\">Read the pop-up message to ensure that this is what you want to do</li>\n<li data-list-item-id=\"e91b58ccd3aef761edac9a1a2eccd1d5e\">Click the red <strong>Unlock budget</strong> button the pop-up message</li>\n<li data-list-item-id=\"e8b33732ce0b8f7614f0c3af0b8fcfaf3\">Click the pencil icon(s) next to all of the original budgets and costs that you need to change</li>\n<li data-list-item-id=\"e38c7747e17774de67ca254e3bd6c46b9\">Click the blue checkmark next to the new amount</li>\n<li data-list-item-id=\"e786a4958ddcb9f22cf1c082556905055\">Click on the blue <strong>Lock budget</strong> button on the right-hand side of the screen once again</li>\n<li data-list-item-id=\"eb666fefd39296c17b5c0e4d83166d75d\">Confirm this choice by clicking the <strong>Lock budget</strong> button on the new pop-up</li>\n</ol><p><img src=\"https://help.fieldwire.com/hc/article_attachments/34630249108241\" alt=\"2025-04-23_10-26-19 (1).gif\"></p><p> </p><h2 id=\"h_01K6G4KNSDBAGFPW0JYZ6S32SX\">Activity Feed</h2><p>Throughout the Budget creation process, those who can access the Budget module will be able to keep track of the changes made to line items, including changes to Budget, Cost, and more. Users will also be able to add notes to the activity feed to help maintain an audit trail.</p><p>To access the activity feedback, you need to do the following:</p><ol>\n<li data-list-item-id=\"ed066d5ece1c5c57c22c88b98ea9cffdb\">Navigate to the Budget module</li>\n<li data-list-item-id=\"ee2c8cfcfc24ecac187bd270cd68bdccd\">Make changes to your Budget or Cost line items</li>\n<li data-list-item-id=\"e0d9a0682b8a44fbddbcaab3fc9ce790c\">On the line item where you made the update, click on that line item to bring up the side panel</li>\n<li data-list-item-id=\"eecbd4387dca1778503b1bd9066be4f23\">Select the <strong>Activity</strong> tab</li>\n</ol><p>Here, you will be able to see all of the changes that have been made to that line item as well as add any relevant notes to the feed.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 1470/734;\" src=\"https://help.fieldwire.com/hc/article_attachments/39581877147409\" width=\"1470\" height=\"734\"></figure><p> </p><p>On the <strong>Activity</strong> feed of individual line items, you can also link existing files and forms! This creates a simple way to manage documentation, right from the Budget activity tab. To add a file and/or form:</p><ol>\n<li data-list-item-id=\"e6c52eca50f351181f877269f33100d09\">Navigate to the <strong>Budget</strong> tab</li>\n<li data-list-item-id=\"ed8209ca93229f97cb75dfb661df5cfa1\">Select the <strong>individual line item</strong> where you want to add the file/form</li>\n<li data-list-item-id=\"ec93efab2738604370053593cdbb10c39\">Click the <strong>Activity</strong> tab</li>\n<li data-list-item-id=\"eea233d2a98b00774cf57896071fdf973\">Click <strong>+ Add attachment or link</strong>\n</li>\n<li data-list-item-id=\"ebe3c32f5252cf3d227627b6cc59f4311\">Choose to \"<strong>Attach from Files</strong>\", \"<strong>Link from Forms</strong>\", or click <strong>+ Upload new file</strong>\n</li>\n<li data-list-item-id=\"e4deee8e4d90c7b28d757e271b8cca039\">Select the file/form you want to attach to that line item's Activity feed</li>\n<li data-list-item-id=\"e92ce768109aaf974c4a2934c974643a9\">Click <strong>Add notes</strong>\n</li>\n</ol><p>The form/file will then be added to the Activity feed with a time/date stamp.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/41984693187345\" width=\"2940\" height=\"1468\"></p><p> </p><h2 id=\"h_01J9P967ERJCME5VQAHZQV5PN4\">Subcontractors Setup</h2><p>If there are 3rd party subcontractors on the project, select the “Subcontractor” cost type when creating a budget line item. Once you lock the budget, an \"Assign to” button will appear next to the subcontractor line items. Click on this button to bring up another modal where you can assign the line item to the subcontractors company in your project as well as set the original cost. Once you're finished, click “Assign”.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29040527917457\" alt=\"2024-10-08_10-49-05 (1).gif\"></p><p> </p><p>If you assigned the line item to the incorrect subcontractor's company, you can choose to Reassign or Unassign it even if the budget is locked. To do so</p><ol>\n<li data-list-item-id=\"e25e32e4e3fb642bac6f23e06efb04d53\">Navigate to the <strong>Budget</strong> modal</li>\n<li data-list-item-id=\"efc6c93846c7850f4fc535a8ec9819899\">Click the <strong>kebab menu (⋮)</strong> shown in the screenshot below</li>\n<li data-list-item-id=\"eb66009171e7b7fe1af3aabd6a0302434\">Select <strong>Reassign</strong> or <strong>Unassign</strong> depending on what you are looking to accomplish<ul><li data-list-item-id=\"e6f526f01cc7cecee21af94b56877eaac\">If you choose to unassign the line item, the <strong>Assign to</strong> button with reappear</li></ul>\n</li>\n</ol><p><strong>Note:</strong> The option to Unassign will only be available if there are no change orders linked to that line item. If you try to unassign it with change orders linked, you'll receive an error message.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/36545348983441\" width=\"2940\" height=\"1468\"></figure><p> </p><p> </p><h2 id=\"h_01J9P9YF3Z5JGN4V5NEQ9KH7TT\">Change Orders and Budget</h2><p>The Change Orders and Budget modules are inherently connected with creating and choosing cost codes.</p><p>After you create a change order, select a cost code so the cost lands in the budget.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043806444945\" alt=\"unnamed (3).png\"></p><p> </p><p>Once you're done filling out the Change order, click the “Send” button and select “Submit for approval” then send it to your client.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043806446353\" alt=\"unnamed (4).png\"></p><p> </p><p>The change order status will update to “Pending approval”.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043806449297\" alt=\"unnamed (5).png\"></p><p> </p><p>The value that you input on the change order will appear in the Budget module, specifically in the \"Budget\" section in the 'Pending' column, and the corresponding cost code that was linked to it, as shown in the screenshot below.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043793453841\" alt=\"unnamed (6).png\"></p><p> </p><p>Once the change order is approved it will update the “Current” column in the Budget module.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043806459665\" alt=\"unnamed (7).png\"></p><p> </p><h3 id=\"h_01J9PREQ4102TBFMSZWWEB0DKX\">Subcontractor Change Orders</h3><p>After you create a change order, request the cost from a subcontractor by clicking on the \"Send\" dropdown button and then clicking \"Request cost\".</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043993161105\" alt=\"unnamed (8).png\"></p><p><strong>Note: </strong>Subcontractors must be a project user in order to have Change Orders assigned to them.</p><p>The change order status will update to “Requested” and the subcontractor will receive an email notification.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043993161873\" alt=\"unnamed (9).png\"></p><p> </p><p>If the subcontractor does not fill out the change order in Fieldwire and, instead, sends it back to you, you can submit it on their behalf by clicking “Actions” and “Submit on behalf”.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29044005648913\" alt=\"unnamed (10).png\"></p><p> </p><p>You can then fill in the change order on behalf of the subcontractor, selecting the corresponding cost code. Once you're done filling it out, click the blue \"Submit on behalf\" button.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043993170449\" alt=\"unnamed (11).png\"></p><p> </p><p>The subcontractor's change order cost will appear under the “Cost” side of the budget in the “Pending” column as well as the corresponding cost code that was linked to it.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29043993171345\" alt=\"unnamed (12).png\"></p><p> </p><p>Once the change order is approved it will update the “Current” column in the Budget module.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29044005651601\" alt=\"unnamed (13).png\"></p><p> </p><h2 id=\"h_01J9QM7Y1DNDCP7T1SC3HSXQ5T\">Actual Cost</h2><p>To add an actual cost to any line item, click on it and a side sheet will appear:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29049156413585\" width=\"696\" height=\"300\"></p><p>Select the '<strong>Cost</strong>' tab:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29049172482321\" width=\"696\" height=\"300\"></p><p>Click on '<strong>+ New cost</strong>':</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29049156413841\" width=\"721\" height=\"311\"></p><p>In the modal add in your new cost name, cost value, and any attachments and click <strong>Create</strong>:</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29049156414225\" width=\"752\" height=\"324\"></p><p>Once the Actual cost is created it will appear in the side sheet for the budget line item and in the Actual column in the budget table.</p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29049172483473\" width=\"752\" height=\"323\"></p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/29049172484625\" width=\"691\" height=\"298\"></p><p><strong>Note</strong>: Multiple actual costs can be added for any line item.</p><p> </p><h3 id=\"h_01K848AGQWBGS9SSB2ZF2TABTC\">Import Actual Costs</h3><p>Admins can bulk import actual costs from ERP systems to quickly compare project spending against budgets. </p><p>To do so:</p><ol>\n<li data-list-item-id=\"edcabf9d846d6b22e731724ef8eba3b56\">Navigate to the <strong>Budgets</strong> tab</li>\n<li data-list-item-id=\"e6689235341ad436790043e63f5da7898\">Click <strong>Import</strong>\n</li>\n<li data-list-item-id=\"ea56ee2027bbefc169bb8c69723e5cac4\">Select <strong>Import actual costs</strong>\n</li>\n<li data-list-item-id=\"e03dd0e85c85054ebc2cbd44003968b0e\">If you haven't already done so, download the template by clicking <strong>Download template</strong> to ensure your actual costs import properly</li>\n<li data-list-item-id=\"e4159d27a9b10c5e37e4394462d514554\">Utilize the provided Excel template to collect all of the relevant data that you want/need imported into Fieldwire</li>\n<li data-list-item-id=\"e2759d5febb1fd305112f864580bfda9c\">Click <strong>Select file</strong> or drag and drop your updated Excel file into the upload box</li>\n</ol><p><em>Step 5 - Below is a screenshot to provide a basic example of how to best utilize the Excel template</em></p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/40410909197073\" width=\"2940\" height=\"1468\"></figure><p> </p><p>After you have successfully uploaded the spreadsheet, the names and values of your Actual Costs will be added to their respective line items.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 1470/734;\" src=\"https://help.fieldwire.com/hc/article_attachments/40410917478545\" width=\"1470\" height=\"734\"></figure><p> </p><p>If your Excel template does not upload successfully, an error reason will be displayed. In the example from the screenshot below, a cost code in row 2 of my spreadsheet does not match with an existing cost code in the project so I need to check which cost codes I currently have on the project and cross-reference it with what I have on the spreadsheet to ensure they match.</p><p>If you believe you are receiving the error message incorrectly, please reach out to <a href=\"mailto:support@fieldwire.com\">support@fieldwire.com</a> for further investigation.</p><figure class=\"wysiwyg-image\"><img style=\"aspect-ratio: 2940/1468;\" src=\"https://help.fieldwire.com/hc/article_attachments/40410909197969\" width=\"2940\" height=\"1468\"></figure><p> </p><h2 id=\"h_01JW9PPRQ8KYH0YA8WMPEB2271\">Deleting Line Items</h2><p>When you need to Delete line items you must follow the below steps:</p><ol>\n<li style=\"background-color: transparent; border-width: 0px; box-sizing: border-box; line-height: inherit; margin: 0px; outline: 0px; padding: 0px; vertical-align: baseline;\" data-list-item-id=\"e994b83958a805b18bd68de56cfbe1813\">Unlock the Budget.</li>\n<li style=\"background-color: transparent; border-width: 0px; box-sizing: border-box; line-height: inherit; margin: 0px; outline: 0px; padding: 0px; vertical-align: baseline;\" data-list-item-id=\"eaa7d172c6ce7a36a833b5bfb27f70656\">Delete line items by their individual row or by their group (shown below).</li>\n<li style=\"background-color: transparent; border-width: 0px; box-sizing: border-box; line-height: inherit; margin: 0px; outline: 0px; padding: 0px; vertical-align: baseline;\" data-list-item-id=\"ec9802f954080f6010c2a03bff7770a83\">The trash icon appears when hovered over the rows.</li>\n</ol><p><img src=\"https://help.fieldwire.com/hc/article_attachments/35668719058577\" alt=\"cleanshot_2025-03-27_at_08.42.24_720.png\" width=\"534\" height=\"342\"></p><p> </p><p><strong>Note:</strong> Line items can't be deleted if they have an actual cost, change order, or subcontractor associated with that line item so those connections need to be removed in order for it to be deleted.</p><p> </p><h2 id=\"h_01JQEH4VW4NRSAFXFJG9VYKDYC\">Editing and Delete 'Actual Cost'</h2><p id=\"h_01JQEH75ANTVX3MHX4M50N8PFF\">Teams can now edit or delete the actual cost of budget line items. Anyone with access to the 'Budget' modal can make these changes, and the total 'Actual Cost' will update automatically.</p><p>To edit or delete the Actual Cost, do the following:</p><p>1. Go to the <strong>Budget</strong> modal</p><p>2. Click on the <strong>line item </strong>with the Actual Cost you want to edit or delete</p><p>3. Select the <strong>Cost</strong> tab</p><p>4. Click the <strong data-start=\"1050\" data-end=\"1064\">kebab menu</strong> (⋮) next to the Actual Cost you want to edit or delete</p><p>5. Select <strong>Edit</strong> or <strong>Delete</strong></p><p>6. Confirm your selection (<strong>Save</strong> or <strong>Delete</strong>)</p><p> </p><p><em>Watch process below:</em></p><p><img src=\"https://help.fieldwire.com/hc/article_attachments/33998372363921\" alt=\"2025-04-01_15-08-21 (1).gif\"></p><p> </p><h3 id=\"h_01J9P8GP9BZEVZD39DGBHQVHAB\">More Information</h3><ul>\n<li data-list-item-id=\"e4fd47ded5ce6705f9768453f0eca9489\"><a href=\"https://help.fieldwire.com/hc/en-us/articles/18828438733083\" target=\"_blank\" rel=\"noopener noreferrer\">Introduction to Change Orders in Fieldwire</a></li>\n<li data-list-item-id=\"e6a7ddcd98cd86692b8b189a61929da30\"><a href=\"https://help.fieldwire.com/hc/en-us/articles/4408422176539\">Introduction to RFIs in Fieldwire</a></li>\n<li data-list-item-id=\"e5ddbddc54f88944ddfb9881fc86af796\"><a href=\"https://help.fieldwire.com/hc/en-us/articles/7160473659419\" target=\"_blank\" rel=\"noopener noreferrer\">The Submittals Workflow in Fieldwire</a></li>\n</ul><p class=\"wysiwyg-text-align-center\"><em>Budgets in Fieldwire</em></p><figure class=\"wysiwyg-media\"><div data-oembed-url=\"https://youtu.be/2ILJEvcfBIs?feature=shared\"><iframe src=\"//www.youtube-nocookie.com/embed/2ILJEvcfBIs?feature=shared\" frameborder=\"0\" allowfullscreen=\"\" allow=\"encrypted-media\" style=\"width: 100%; aspect-ratio: 16 / 9;\"></iframe></div></figure>","user_segment_ids":[]}}